All of the one wall has now been stripped back to brick, and has been PVA'd ready for plasterboard & plaster.
The leak from the bath drain has been sealed, and the plasterboard has been replaced where it has been cut.
The walls have now been white mist coated, ready for a good white coat before going to it's final colour.
Next on the list, is to plasterboard the one wall and plaster along with the ceiling patchwork. Once this is completed, the final white coat will be done (2-3 weeks time once plastered has dried & settled).
In the mean-time, I will start to remove the ceiling tiles in the master bedroom.
No comments:
Post a Comment